Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.

Airbus A350 XWB Test Stand
Erding, Alemania

  • Approval tests on the new wide-bodied Airbus A350 XWB in a specially erected testing facility
  • Scaffold solution for test preparations as well as continuous measurement and inspection work
  • Time-consuming fatigue tests on the fuselage and wings through a simulation of 86,400 flights (equivalent to three times the expected service life) within a period of 2-3 years
  • Two different endurance tests: EF-2 test (middle fuselage section including centre wing box and both wings) and EW test (systematic application of stress on the wing up to the analytical breaking load point)


Client: IABG Industrieanlagen-Betriebsgesellschaft mbH, Ottobrunn

Scaffold Contractor: Kerscher Gerüstbau, Atting/Rinkam

Ubicación

El proyecto

Impresiones del proceso del proyecto.

Información del Proyecto

Statement of Michael Stodt, Head of Aircraft Structural Testing at IBAG, about the scaffolding system PERIup from PERI.
Statement of Michael Stodt, Head of Aircraft Structural Testing at IBAG, about the scaffolding system PERIup from PERI.
Michael Stodt
Head of Aircraft Structural Testing at IBAG
The recipe for success is the modularity and adaptability of the PERI UP scaffolding system – as well as the combinability with other products in the PERI portfolio. Furthermore, the project support provided by the PERI engineers was very professional and extremely positive.

Productos relacionados

Estás trabajando en proyectos como este?

Llámenos al +56 2 2444 6000 para analizar más a fondo sus necesidades.
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.