Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.

Estadio deportivo Lora
Split, Croacia

Sala polivalente de planta octogonal de 120 m x 80 m y 12.500 plazas

Finalizado: 2009 para el campeonato mundial de balonmano en Croacia.

Dinarik d.o.o., Donji Prolozac

Ubicación

El proyecto

Impresiones del proceso del proyecto.

Información del Proyecto

 Oliver Pezer, Work preparation and logistics, Statement Sportarena Lora
 Oliver Pezer, Work preparation and logistics, Statement Sportarena Lora
Oliver Pezer
Work preparation and logistics
We chose PERI because of the professional formwork planning and support. All technical requirements were met in a cost-effective way with the PERI systems.

Productos relacionados

Estás trabajando en proyectos como este?

Llámenos al +56 2 2444 6000 para analizar más a fondo sus necesidades.
Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.
Sports arena Lora, Split, Croatia - The PERI solution served as both shoring and an assembly platform on which the enormous steel trusses of the roof construction were set down, assembled and moved into position.