Construction of the two 155 m high towers with trapezoidal-shaped, extremely slender ground plans was realized using a reinforced concrete design. Within the angular core geometry, the in part only 30 cm thick walls had to be concreted and climbed.
Construction of the two 155 m high towers with trapezoidal-shaped, extremely slender ground plans was realized using a reinforced concrete design. Within the angular core geometry, the in part only 30 cm thick walls had to be concreted and climbed.

Dubai Frame
Dubai, Emiratos Árabes Unidos

  • Extraordinary walk-in work of art structure in the form of a 155 m high and 93 m wide picture frame
  • Complex, slender shapes of the towers with angular geometries
  • 75 m wide, self-supporting steel bridge construction as accessible crosspiece for connecting both towers
  • Additional crosspiece on the ground which optically closes the picture frame


Al Rostamani Pegel L.L.C. (ARP)

Ubicación

El proyecto

Impresiones del proceso del proyecto.

Información del Proyecto

With PERI, we have already realized numerous projects and know the high-end solutions as well as the high standard of service. For this project, the complexity of the building´s structure was initially easy to underestimate but we were always supported on-site whenever needed. In the end, we could climb in 3½-day cycles thus saving a total of 30 days construction time.
With PERI, we have already realized numerous projects and know the high-end solutions as well as the high standard of service. For this project, the complexity of the building´s structure was initially easy to underestimate but we were always supported on-site whenever needed. In the end, we could climb in 3½-day cycles thus saving a total of 30 days construction time.
Tobias Heilig
Project Manager
With PERI, we have already realized numerous projects and know the high-end solutions as well as the high standard of service. For this project, the complexity of the building´s structure was initially easy to underestimate but we were always supported on-site whenever needed. In the end, we could climb in 3½-day cycles thus saving a total of 30 days construction time.

Productos relacionados

Estás trabajando en proyectos como este?

Llámenos al +56 2 2444 6000 para analizar más a fondo sus necesidades.
Construction of the two 155 m high towers with trapezoidal-shaped, extremely slender ground plans was realized using a reinforced concrete design. Within the angular core geometry, the in part only 30 cm thick walls had to be concreted and climbed.
Construction of the two 155 m high towers with trapezoidal-shaped, extremely slender ground plans was realized using a reinforced concrete design. Within the angular core geometry, the in part only 30 cm thick walls had to be concreted and climbed.