El proyecto
Impresiones del proceso del proyecto.
Información del Proyecto
![Peter Amann, Managing Director/Installation Supervisor and Tobias Doebele, Site Manager](https://cdn.peri.cloud/.imaging/xlWide/dam/8a2b1647-db23-49a8-a058-08181e7546b9/16495/peter-amann-managing-director-installation-supervisor-and-tobias-doebele-site-manager.jpg)
![Peter Amann, Managing Director/Installation Supervisor and Tobias Doebele, Site Manager Peter Amann, Managing Director/Installation Supervisor and Tobias Doebele, Site Manager](https://cdn.peri.cloud/.imaging/xlWide/dam/8a2b1647-db23-49a8-a058-08181e7546b9/16495/peter-amann-managing-director-installation-supervisor-and-tobias-doebele-site-manager.jpg)
Peter Amann | Tobias Doebele
Director General/Supervisor de Instalación | Administra
PERI UP ofrece la combinación perfecta de flexibilidad, funcionalidad y velocidad de montaje. Todo se puede combinar y hemos encontrado una solución para cada necesidad en el menor tiempo posible.
Estás trabajando en proyectos como este?
Llámenos al +56 2 2444 6000 para analizar más a fondo sus necesidades.
![Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.](https://cdn.peri.cloud/.imaging/mWide/dam/a62d76f1-973a-4c96-bf58-dc433b01811e/16492/centre-pompidou-the-tent-like-roof-construction-reached-a-height-of-77-m.jpg)
![Centre Pompidou - The tent-like roof construction reached a height of 77 m Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.](https://cdn.peri.cloud/.imaging/mWide/dam/a62d76f1-973a-4c96-bf58-dc433b01811e/16492/centre-pompidou-the-tent-like-roof-construction-reached-a-height-of-77-m.jpg)