RONDO 1

Datos de Proyecto

Ubicación: Warsaw, Polonia

High-rise project in the financial centre of Warsaw with a gross floor area of 100,00 m².

  • total height: 192 m
  • storeys: 40
  • start of construction: 2003
  • opening: 2006

Requerimientos

  • enclosure of the respective topmost floors
  • two concrete cores which were climbed in connection with the slabs

Cliente

HOCHTIEF Polska Sp. z o.o.

Beneficios para el cliente

  • crane-independent shuttering through use of ACS P
  • simultaneous climbing with up to four climbing platforms
  • safe and fast construction progress
  • hazard-free working at the facade in the floors below
Rondo 1 Statement - Dariusz Kolasa, Construction manager
Dariusz Kolasa
Construction manager

I have been working in reinforced concrete construction for more than ten years, and during this time, we have built strutures with the most different requirements. Here, the PERI formwork systems have always proved that they can be used in a very universal and efficient way. I also found the PERI self-climbing technology convincing at this jobsite. The system works reliably, independent of cranes and it is very safe. In combination with the extremely professional technical service and the reliable logistics management, PERI really supported us in the best possible way during the Rondo project!

Solución PERI

  • climbing protection panel to protect staff from falling down, and against the weather
  • slab formwork solution with SKYDECK drophead