El proyecto
Impresiones del proceso del proyecto.
Información del Proyecto
![Statement of Michael Stodt, Head of Aircraft Structural Testing at IBAG, about the scaffolding system PERIup from PERI.](https://cdn.peri.cloud/.imaging/xlWide/dam/e4d170a8-e120-46bc-94f4-0f9385904e69/17826/michael-stodt-about-the-working-scaffold-solution-from-peri-at-the-airbus-test-facility-in-erding.jpg)
![Michael Stodt about the working scaffold solution from PERI at the Airbus test facility in Erding. Statement of Michael Stodt, Head of Aircraft Structural Testing at IBAG, about the scaffolding system PERIup from PERI.](https://cdn.peri.cloud/.imaging/xlWide/dam/e4d170a8-e120-46bc-94f4-0f9385904e69/17826/michael-stodt-about-the-working-scaffold-solution-from-peri-at-the-airbus-test-facility-in-erding.jpg)
Michael Stodt
Head of Aircraft Structural Testing at IBAG
The recipe for success is the modularity and adaptability of the PERI UP scaffolding system – as well as the combinability with other products in the PERI portfolio. Furthermore, the project support provided by the PERI engineers was very professional and extremely positive.
Estás trabajando en proyectos como este?
Llámenos al +56 2 2444 6000 para analizar más a fondo sus necesidades.
![Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.](https://cdn.peri.cloud/.imaging/mWide/dam/6e7c7698-a197-4976-93d2-f4e4ca719c56/17873/the-peri-up-working-scaffold-scaffold-provides-the-solution-for-test-preparations-as-well-as-continuous-measurement-and-inspection-work.jpg)
![The PERI UP working scaffold Scaffold provides the solution for test preparations as well as continuous measurement and inspection work. Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.](https://cdn.peri.cloud/.imaging/mWide/dam/6e7c7698-a197-4976-93d2-f4e4ca719c56/17873/the-peri-up-working-scaffold-scaffold-provides-the-solution-for-test-preparations-as-well-as-continuous-measurement-and-inspection-work.jpg)