Aquatics Centre, London

Aquatics Centre
London, Reino Unido

Swimming stadium for the Summer Olympic Games 2012



Main Contractor: Balfour Beatty plc.
Subcontractor: A J Morrisroe & Sons Ltd., Borehamwood/London
Architect: Zaha Hadid, London

Ubicación

El proyecto

Impresiones del proceso del proyecto.

Información del Proyecto

A portrait of Tony Henry, Senior Project Manager, A J Morrisroe & Sons Ltd., Borehamwood/London
A portrait of Tony Henry, Senior Project Manager, A J Morrisroe & Sons Ltd., Borehamwood/London
Tony Henry
Senior Project Manager
With the eyes of the world on London in 2012, the quality and finish of the concrete in the Aquatics Centre had to be of Gold Medal standard. The walls around the pools, particularly the end walls, curved vertically and horizontally whilst changing thickness and needed to be fair faced on both sides. To create the fluid geometry concept intended by Zaha Hadid, the specification required shutters designed and built to millimetre accuracy in 3 dimensions. After using PERI products over many years, we knew this would be “The Job” for PERI. Working rigorously with the PERI engineers installing the 3D modelled formwork, we achieved the high quality architectural finish required.