You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Tošanovice-Žukov Bridge

Datos de Proyecto

Ubicación: Ostrava, República Checa

Design: steel composite bridge
Length: 720 m

Requerimientos

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Cliente

Metrostav a.s., Division 4, Prague

Beneficios para el cliente

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

Solución PERI

Two modular formwork carriages from the VARIOKIT system