Sheikh Khalifa Bridge
Abu Dhabi,
Emiratos Árabes Unidos
Connection between Abu Dhabi City and Saadiyat Island
- length: 1,455 m
- width: 60 m (one of the widest bridges in the world)
ARGE Ed. Züblin AG, Saif Bin Darwish Engineering Contractor
Ubicación
El proyecto
Impresiones del proceso del proyecto.
The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
With the help of the PERI formwork and scaffolding solution, the 20 m high individual supports of the V-shaped identical sets of piers with 27.45 degree inclinations could be accurately constructed.
Even in tightly-spaced working areas, tidily-arranged material storage using pallets and transport containers ensured fast transportation of materials.
The flexible PERI UP scaffold system could be geometrically adapted at all heights and to suit every load case.
Construction of the eastern foreland bridge was carried out on falsework in 55 m sections using pre-assembled raised formwork units consisting of rentable PERI system components.
The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
With the help of the PERI formwork and scaffolding solution, the 20 m high individual supports of the V-shaped identical sets of piers with 27.45 degree inclinations could be accurately constructed.
Even in tightly-spaced working areas, tidily-arranged material storage using pallets and transport containers ensured fast transportation of materials.
The flexible PERI UP scaffold system could be geometrically adapted at all heights and to suit every load case.
Construction of the eastern foreland bridge was carried out on falsework in 55 m sections using pre-assembled raised formwork units consisting of rentable PERI system components.
Información del Proyecto
From PERI, we are used to getting reliability - for the technical support and the systems. The formwork solution used with VARIO and raised formwork units is extremely stable and the PERI UP modular scaffold is easy to install and flexible in use. The moving procedure is carried out with large-sized transportable units. With the PERI formwork solution for the cantilevered construction, it was possible for us to minimize the work involved for adapting to the different bridge cross-sections from cycle to cycle.
Jens Nagel | Alexander Schmalz
Deputy Project Manager | Site Manager