Puente de La Pepa, Bahia de Cádiz, Spain - Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.

Puente de La Pepa
Bahia de Cádiz, España

  • construction: cable-stayed bridge
  • total length: 3.2 km
  • span of main bay: 540 m
  • two pylons at a height of 190 m
  • six-lane road at a height of 69 m


UTE Puente de Cádiz:
Dragados S.A., Madrid; F.P.S. S.A., Madrid

El proyecto

Impresiones del proceso del proyecto.

Información del Proyecto

Puente de la Pepa, Cadiz - Victor M. Jiménez Aguadero, Construction Manager
Puente de la Pepa, Cadiz - Victor M. Jiménez Aguadero, Construction Manager
Victor M. Jiménez Aguadero
Construction Manager
We were able to define a formwork concept for this bridge project together with the PERI engineers which is based on the experience from numerous projects that have been carried out so far.

Productos relacionados

Estás trabajando en proyectos como este?

Llámenos al +56 2 2444 6000 para analizar más a fondo sus necesidades.
Puente de La Pepa, Bahia de Cádiz, Spain - Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.
Puente de La Pepa, Bahia de Cádiz, Spain - Almost half of the 3.2 km long bridge construction crosses the Bay of Cadiz, with a 540 m span and 69 m vertical clearance between the two pylons.